When you head back from Depot Road, the first part of the trail is a series of open fields from an area that looks like at some point in the past was mined for gravel.
Taken on Saturday April 25, 2020 at Black Creek Marsh Wildlife Management Area.
During the snowmobile season, a temporary bridge was built over the wash-out on Teachout Road, to be replaced with a culvert in fill for vehicle access eventually.
Taken on Sunday April 19, 2020 at Auger Falls.
There were a lot of them along the mud cliffs of Barett Winnie Road.
Taken on Saturday May 19, 2012 at Kayak the Hudson.