While I certainly welcome lower-cost solar panels, and would most certainly include solar power when I own my off-grid homestead, I am deeply concerned about the tens of thousands, and soon to be hundreds of thousands of acres of land being developed for industrial solar farms across the state. Information both on solar farms and smaller, more appropriate uses of solar technology.
While rooftop solar is often the “default” due to space constraints, it comes with several inherent compromises compared to other mounting methods. Ground-mounted systems and solar carports often outperform rooftop panels in production, but rooftop solar remains the most cost-effective entry point for many homeowners.
Feature
Rooftop Solar
Ground-Mounted Solar
Upfront Cost
Lower (~20% less) as it uses existing structures.
Higher due to trenching, foundations, and racking.
Efficiency
Lower; panels trap heat and are limited by roof angle.
Higher; 15โ25% more energy via optimal tilt/airflow.
Maintenance
Harder; requires roof access, ladders, and safety gear.
Easier; eye-level access for cleaning and snow removal.
Impact
May lead to roof leaks or complicate roof replacement.
Consumes yard space.
Problems with Rooftop Installations
Structural Risks: Penetrating a roof for mounts can lead to leaks, even with professional installation. Furthermore, if you need to replace your roof, the panels must be removed and reinstalled at a significant extra cost.
Safety & Access: Cleaning debris or removing snow is significantly more dangerous at height.
Heat Degradation: Solar panels lose efficiency as they get hotter; rooftop units often lack the airflow found in ground-mounts, leading to higher degradation.
When people think of “development,” they usually think of things that change the land forever:
Subdivisions: Cutting a 200-acre farm into 50 tiny tax parcels.
Permanent Infrastructure: Paving over fields for strip malls or warehouses.
Heavy Industrial Use: Permanent structures that mean the land will never be a farm again.
Solar is fundamentally different. Under solar and remains a single, contiguous parcel. It isn’t being carved up or sold off to build a cul-de-sac. It stays in the family, and at the end of the lease, the panels come off and the dirt is still there.
The “Land Resting” Perspective
When a farmer signs a 30-year lease for solar, that land is essentially being “fallowed” or rested.
No Chemicals: Most solar agreements state there are no pesticides or heavy fertilizers being sprayed on that soil for three decades.
Pollinator Habitats: Many solar sites now require “pollinator-friendly” seed mixes under the panels, which can actually improve the soil quality and help local bee populations.
Future Farming: Once the 30 years are up and the panels are removed via the bond money, the soil might actually be in better shape for the next generation of farmers than it was after decades of intensive mono-cropping.
Returning Solar Farms to “Greenfield” Status
The goal of the state’s solar restoration standards is to ensure the land is reversible. Unlike a shopping mall or a housing development, solar is considered a “temporary” use of land (usually 25โ40 years).
The restoration requirements typically include:
Total Removal: Taking out every panel, racking system, andโmost importantlyโthe steel piles driven into the ground.
Underground Cleanup: Removing all underground cabling to a depth of at least 3 or 4 feet so it doesn’t interfere with future plowing.
Soil Health: De-compacting the soil in areas where heavy equipment drove and replacing any topsoil that was moved during construction.
Road Removal: Digging up gravel access roads and returning those strips to farmable soil.
The Decommissioning Bond: A Financial Guarantee
Before a developer can even break ground, they must put up a letter of credit or a surety bond.
Not a Promise, but Cash: This isn’t just a signed paper. It is a financial instrument held by the state or town.
Bankruptcy Proof: If the solar company disappears or goes out of business, the money is already there. The town or state can pull those funds to hire a crew to remove the panels.
Regular Updates: These bonds are usually re-evaluated every 5 to 10 years to account for inflation, ensuring the “cleanup fund” stays large enough to cover the actual costs in the future.
The Big Picture
We are in a climate crisis. We have to reduce carbon emissions in the next few years to avoid the worst impacts of extreme weather and droughtโthings that hit farmers harder than anyone else.
If you spend any time in rural New York Facebook groups or the “Internets” lately, youโve seen it: a wave of posts warning about faceless state agency (Office of Renewable Energy Siting and Electric Transmission) is steamrolling local rights to blanket our farmland in solar panels. It might be one of the most misunderstood pieces of the energy puzzle in New York right now.
To understand ORES, you got to look at the law that created it.
Why ORES Exists: The need to build large-scale solar to address climate change and energy needs
ORES stands for the Office of Renewable Energy Siting and Electric Transmission. It wasnโt created for making solar developers rich or to titillate the woke mind; it exists because of the Climate Leadership and Community Protection Act (CLCPA) and the need to develop new carbon-free sources of electricity as we stare down the climate crisis.
State law requires minimization of future carbon emissions by mandating:
70% renewable electricity by 2030.
Zero-emission electricity (without fossil fuels) by 2040.
The state is under a legal mandate to build infrastructureโfast. Solar is currently the fastest, most scalable way to hit those targets.
Why We Need Solar Now: Every Year Matters Right Now
Scientists warn that we must significantly reduce emissions in the next few years to avoid the most catastrophic impacts.
Tipping Points: We are approaching “tipping points” where changes become irreversible (like the melting of Arctic permafrost or the collapse of major ice sheets).
Extreme Weather: Rapid warming is already fueling more intense hurricanes, prolonged droughts, and more destructive wildfires.
The 1.5ยฐC Goal: International agreements aim to limit warming to 1.5ยฐC above pre-industrial levels. Exceeding this increases the risk of global food shortages and mass displacement.
Compound Interest: Carbon stays in the atmosphere for centuries. Every ton we emit now makes the future goal harder to reach; reducing emissions today is far more effective than trying to “clean up” tomorrow.
This urgency is why New York passed the CLCPA and created ORES to get solar farms approved, over local opposition. The state views large-scale solar and the ORES process as a fast-track emergency response to these immediate environmental threats.
ORES Handles Environmental Reviews
Under ORES, every large-scale solar project must undergo a rigorous environmental “vets” process before a single panel is installed.
Impact Mapping: Developers must submit detailed studies on wetlands, threatened species, and forest fragmentation.
The “Net Conservation Benefit”: If a project impacts a protected species (like the Short-eared Owl or Northern Harrier), the developer is legally required to implement a plan that results in a net gain for that species elsewhere.
Public Comment: ORES is required to hold at least one public comment period and a public hearing in the host community to hear environmental concerns from residents.
Key Environmental Protections in the ORES Process
ORES mandates specific protections that developers cannot ignore:
Wildlife Protection: Projects must avoid or minimize impacts on grassland birds and other at-risk wildlife. Construction is often restricted during nesting seasons.
Water Quality: Developers must follow strict stormwater management plans to prevent runoff into local streams and neighbors’ properties.
Decommissioning Funds: To protect the “rural character” long-term, ORES requires developers to post a financial security (bond). This ensures that if the company goes belly-up, there is money set aside to remove the equipment and restore the land to its original state.
Agricultural Mitigation: If a project uses “Prime Farmland,” the developer often has to pay a fee into a state fund dedicated to supporting permanent farmland protection in other parts of the state.
A Local Government “Steamroller”?
The biggest misconception is that ORES exists to ignore municipalities. In reality, ORES only steps in on large-scale projects (systems larger than 25MW). ORES only overrides local laws when those laws make a project physically and economically impossible to build.
For example, ORES often intervenes when towns pass “poison pill” ordinances, such as:
Impossible Setbacks: Requiring panels to be 500โ1,000 feet from all property lines, which effectively wipes out the usable space on most parcels.
Height Restrictions: Setting a maximum height of 6 feet, which doesn’t align with modern, efficient solar racking design.
Total Zoning Bans: Prohibiting solar on all prime farmland or “active agricultural land,” which essentially bans the technology from the town entirely.
The standard ORES uses isn’t just “build whatever you want.” They look at whether local laws are unreasonably burdensome in light of the state’s climate and energy policy.
What is being approved?
Over 30 major projects have been granted final siting permits by ORES since its inception. This represents more than 4 gigawatts of clean energy added to the stateโs pipeline. There has been only one formal dismissal of a project application by ORES. The reason so few projects are “denied” at the final stage is that ORES uses a “redo” system rather than a “fail” system.
The “Incomplete” Barrier: ORES has issued over 50 notices of incomplete application. Practically every project that has ever applied to the office has been sent back to the drawing board at least once for missing data or failing to meet standards.
The Stealth Filter: Many projects never even make it to the official “application” phase. Developers often withdraw or abandon projects during the mandatory pre-application meetings if they realize they cannot meet ORESโs environmental or technical requirements.
The “Only One” Denial: The single project that was formally dismissedโthe Shepherdโs Run Solar project in Copakeโwasn’t rejected because of local opposition, but because the developer lost control of the land they intended to build on.
On average, it takes about 3.7 years for a project to move from its first initial filing to receiving a final permit. The state’s legal deadline only starts ticking after the application is declared 100% completeโa status that itself takes an average of three years to reach.
It's interesting how in some parts of state there is a lot of large-scale industrial solar facilities being built while in other parts of state, not so many. Very few have been built in the Adirondack or Catskill Parks so far.