Ulster County
Foot Bridge
Sign to Start of Trail
Trailhead Parking Lot Sign
First Bridge Your Cross
This replaces the old wooden truck trail bridge that once was here, when it was built as a road in the 1930s.
Taken on Monday July 13, 2009 at Ashokan High Point.Stone Culverts
The first part of the trail has these stone culverts to cover ditches, pre-age of the stainless ones. Bigger creeks are crossed by log bridges, most of which have rotted away.
Taken on Monday July 13, 2009 at Ashokan High Point.