Search Results for: "Map:" Before and After Exit 8
Wade Road Extension
Wade Road Extension and the Single Point Urban Interchange at the Adirondack Northway was designed to reduce congestion at Exit 8.
1995 β Before Wade Road Extension (LEFT)
2018 β After Wade Road Extension (RIGHT)
Exit 3 Northway
Before and after the construction of Exit 3 Northway. Left - Circa 1995, Right Circa 2020.