Some news … 🗞️
I spoke to Andy Ruth’s secretary and she says next week she will be calling to schedule the appointment to install the truck cap. I should have the second solar panel on Saturday, I will drive in some other day next week to get the aluminum bar and some nuts, bolts, plastic conduit, and terry tape. When I get the truck cap, I’ll have to stop by Albany Walmart for a marine battery box for that other lead acid battery I’m pulling from the old rig. I have all of the other connectors, including “A” connectors for mounting bar for the second solar panel.
While I had figured at this point it was unlikely I would be getting the truck cap for this weekend, having not heard from Ruth”s yet, it still is likely that I’ll have things mostly set up for the Juneteenth Weekend. I mostly want to the have the solar wired to the batteries, the inverter hooked up, and a line run to the starting batteries/alternator. Who knows, maybe it will rain Juneteenth Weekend, there is still one more weekend in June to test out equipment and get ready for the big Independence 250 Weekend which I want to spend up at Moose River.


















