Wade Road Extension
Wade Road Extension and the Single Point Urban Interchange at the Adirondack Northway was designed to reduce congestion at Exit 8.
1995 — Before Wade Road Extension (LEFT)
2018 — After Wade Road Extension (RIGHT)
Wade Road Extension and the Single Point Urban Interchange at the Adirondack Northway was designed to reduce congestion at Exit 8.
1995 — Before Wade Road Extension (LEFT)
2018 — After Wade Road Extension (RIGHT)