Solar panels shade carrots, beetroot, saffron in a US farm experiment
Solar
Solar Panels Explained – Unravel the Mysteries of How Solar Panels Work!
Shepards Solar Farm
Decoding The Changes To Solar Net Metering Rules In California – CleanTechnica
Proposed Solar Farms in New York State
This map shows all several additional solar farms proposed for New York, many of much larger scale then existing facilities. Yellow balloons are (L) Regulatory approvals pending. Not under construction, Light Blue means (T) Regulatory approvals received. Not under construction, and Green is (P) Planned for installation, but regulatory approvals not initiated.
11/8/23 - UPDATED with September 2023 DATA This is an interactive map, so make sure to Zoom in to see the exact location of proposed solar farm, and click the balloon to get the full data reported to the Energy Information Agency.
Data Source: Energy Information Agency, Preliminary Monthly Electricity Generator Facilities EIA-860M, Released October 2023. Get the data: eia.gov/electricity/data/eia860m
Additional Utility-Scale Industrial Solar β Proposed in New York State (2022)
Additional Utility-Scale Industrial Solar Proposed in New York State (2022) |
||||||
Plant Name | County | Nameplate Capacity (MW) | Status | Planned Operation Date | Latitude | Longitude |
---|---|---|---|---|---|---|
Hecate Energy Albany 2 LLC | Albany | 20.0 | (V) Under construction, more than 50 percent complete | 12/2023 | 42.50791 | -73.83651 |
Hecate Energy Albany County 1 | Albany | 20.0 | (V) Under construction, more than 50 percent complete | 12/2023 | 42.51546 | -73.83345 |
Hecate Energy Gedney Hill | Albany | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 6/2025 | 42.45173 | -73.89284 |
Alfred Oaks Solar, LLC | Allegany | 115.2 | (P) Planned for installation, but regulatory approvals not initiated | 5/2026 | 42.21000 | -77.82000 |
Cold Creek Solar | Allegany | 108.0 | (P) Planned for installation, but regulatory approvals not initiated | 1/2028 | 42.49500 | -78.08200 |
Kosa | Allegany | 1.5 | (V) Under construction, more than 50 percent complete | 11/2023 | 42.06882 | -77.80742 |
Bakerstand Solar (NY) | Cattaraugus | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 11/2024 | 42.34421 | -78.47842 |
SunEast Dog Corners Solar Project | Cayuga | 20.0 | (T) Regulatory approvals received. Not under construction | 12/2024 | 42.74430 | -76.66531 |
Empire Solar (NY) | Chautauqua | 125.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2027 | 42.25960 | -79.61420 |
NY Fredonia 9824 Route 60 Solar | Chautauqua | 5.0 | (V) Under construction, more than 50 percent complete | 12/2023 | 42.43106 | -79.30247 |
South Ripley Solar | Chautauqua | 270.0 | (L) Regulatory approvals pending. Not under construction | 12/2024 | 42.19812 | -79.75789 |
Afton Solar | Chenango | 5.0 | (U) Under construction, less than or equal to 50 percent complete | 4/2024 | 42.24230 | -75.53364 |
Greene Community Solar | Chenango | 5.0 | (T) Regulatory approvals received. Not under construction | 4/2024 | 42.25207 | -75.82642 |
Hecate Energy Columbia County Solar | Columbia | 60.0 | (P) Planned for installation, but regulatory approvals not initiated | 11/2025 | 42.17503 | -73.59039 |
Shepherd’s Run Solar | Columbia | 60.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2025 | 42.16141 | -73.57453 |
Homer Solar Energy Center | Cortland | 90.0 | (L) Regulatory approvals pending. Not under construction | 11/2027 | 42.65865 | -76.09993 |
Fork in the Road Solar | Dutchess | 1.4 | (L) Regulatory approvals pending. Not under construction | 3/2024 | 41.95000 | -73.75000 |
Elk Street Solar | Erie | 2.4 | (L) Regulatory approvals pending. Not under construction | 4/2024 | 42.85000 | -78.85000 |
NY Grand Island 871 Whitehaven Rd Solar | Erie | 5.0 | (L) Regulatory approvals pending. Not under construction | 12/2024 | 43.02750 | -78.92066 |
NY Lancaster Gunnville Rd Site 1 Solar | Erie | 5.0 | (TS) Construction complete, but not yet in commercial operation | 10/2023 | 42.95263 | -78.61796 |
SunEast Limestone Solar Project | Fulton | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 43.01744 | -74.25296 |
Hecate Energy Cider Solar LLC | Genesee | 500.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2025 | 43.09734 | -78.23041 |
Potic Solar | Greene | 4.9 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.29559 | -73.90120 |
SunEast Flat Hill Solar Project | Herkimer | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 43.04436 | -74.79632 |
SunEast Grassy Knoll Solar Project | Herkimer | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 43.06538 | -74.84372 |
SunEast Hills Solar Project | Herkimer | 20.0 | (T) Regulatory approvals received. Not under construction | 12/2024 | 43.06830 | -74.84923 |
SunEast Watkins Road Solar Project | Herkimer | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 43.06127 | -75.05584 |
ASA Clayton NY Solar I LLC | Jefferson | 1.3 | (V) Under construction, more than 50 percent complete | 11/2023 | 44.16176 | -76.10899 |
FFP – NY Game Farm | Jefferson | 5.0 | (U) Under construction, less than or equal to 50 percent complete | 4/2024 | 44.01276 | -76.00873 |
Greens Corners Solar | Jefferson | 120.0 | (P) Planned for installation, but regulatory approvals not initiated | 3/2025 | 43.93590 | -75.97268 |
Sandy Creek Solar | Jefferson | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 6/2025 | 43.81283 | -76.06884 |
Tracy Solar Energy Center | Jefferson | 119.0 | (L) Regulatory approvals pending. Not under construction | 11/2027 | 44.17594 | -75.98513 |
Copenhagen Solar | Lewis | 4.3 | (V) Under construction, more than 50 percent complete | 10/2023 | 43.86310 | -75.71931 |
Hatchery Solar | Livingston | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 7/2025 | 42.97658 | -77.76974 |
Highbanks Solar | Livingston | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 10/2025 | 42.73723 | -77.91431 |
Horseshoe Solar Energy | Livingston | 180.0 | (U) Under construction, less than or equal to 50 percent complete | 12/2025 | 42.57076 | -77.45296 |
NY Geneseo 3240 W Lake Rd Solar | Livingston | 5.0 | (V) Under construction, more than 50 percent complete | 12/2023 | 42.84721 | -77.71827 |
FFP – NY Werner | Monroe | 5.0 | (V) Under construction, more than 50 percent complete | 12/2023 | 42.96606 | -77.68387 |
High River Energy Center, LLC | Montgomery | 90.0 | (L) Regulatory approvals pending. Not under construction | 5/2024 | 42.90186 | -74.13273 |
Mill Point Solar | Montgomery | 250.0 | (P) Planned for installation, but regulatory approvals not initiated | 11/2025 | 42.91910 | -74.34116 |
Mohawk Solar | Montgomery | 90.5 | (L) Regulatory approvals pending. Not under construction | 11/2024 | 42.88713 | -74.63781 |
SunEast Tabletop Solar Project | Montgomery | 80.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.95950 | -74.56680 |
Slayton Settlement Road Solar | Niagara | 5.0 | (V) Under construction, more than 50 percent complete | 1/2024 | 43.20356 | -78.64543 |
Slayton Settlement Road Solar | Niagara | 2.0 | (V) Under construction, more than 50 percent complete | 1/2024 | 43.20356 | -78.64543 |
Eureka North Solar | Oneida | 3.5 | (V) Under construction, more than 50 percent complete | 12/2024 | 43.12887 | -75.41637 |
Eureka South Solar | Oneida | 5.0 | (V) Under construction, more than 50 percent complete | 12/2024 | 43.13071 | -75.41617 |
SunEast Skyline Solar Project | Oneida | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 43.06307 | -75.45195 |
NY Sorrell Hill II CSG | Onondaga | 5.0 | (TS) Construction complete, but not yet in commercial operation | 11/2023 | 43.14672 | -76.35467 |
Source Power II – Taft | Onondaga | 3.7 | (V) Under construction, more than 50 percent complete | 10/2023 | 43.12198 | -76.04235 |
Summit – Cicero | Onondaga | 5.0 | (V) Under construction, more than 50 percent complete | 11/2023 | 43.20000 | -76.12000 |
SunEast Clay Solar Project | Onondaga | 50.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 43.19255 | -76.17360 |
Route 5 & 20 Community Solar Farm | Ontario | 2.3 | (L) Regulatory approvals pending. Not under construction | 6/2024 | 42.89900 | -77.46100 |
State Route 64N Community Solar Farm | Ontario | 1.2 | (T) Regulatory approvals received. Not under construction | 5/2024 | 42.91500 | -77.45400 |
SunEast Manchester Solar Project | Ontario | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.95832 | -77.19503 |
Mannys Corners Solar 1 LLC | Orange | 4.9 | (TS) Construction complete, but not yet in commercial operation | 12/2023 | 42.96400 | -74.14440 |
Northline Solar | Rensselaer | 4.0 | (V) Under construction, more than 50 percent complete | 11/2023 | 42.86910 | -73.61530 |
SunEast Hilltop Solar Project | Rensselaer | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.80861 | -73.64046 |
NY8 – ELP Stillwater Solar | Saratoga | 20.0 | (V) Under construction, more than 50 percent complete | 10/2023 | 42.92623 | -73.71147 |
Glenville Solar | Schenectady | 4.3 | (V) Under construction, more than 50 percent complete | 11/2023 | 42.83949 | -73.93256 |
NY8 – Teichos Pattersonville | Schenectady | 20.0 | (U) Under construction, less than or equal to 50 percent complete | 11/2023 | 42.88080 | -74.09510 |
East Point Energy Center, LLC | Schoharie | 50.0 | (T) Regulatory approvals received. Not under construction | 3/2024 | 42.46137 | -74.33509 |
NY Beaver Dams Dix 1239 Duvall Rd Solar | Schuyler | 5.0 | (L) Regulatory approvals pending. Not under construction | 11/2024 | 42.29465 | -76.94717 |
Halsey Lane Solar | Seneca | 5.0 | (T) Regulatory approvals received. Not under construction | 12/2023 | 42.60397 | -76.83834 |
ASA DeKalb NY Solar I LLC | St Lawrence | 5.0 | (V) Under construction, more than 50 percent complete | 10/2023 | 44.49209 | -75.24480 |
ASA DeKalb NY Solar II LLC | St Lawrence | 3.0 | (V) Under construction, more than 50 percent complete | 10/2023 | 44.48816 | -75.24438 |
ASA DeKalb NY Solar III LLC | St Lawrence | 3.3 | (V) Under construction, more than 50 percent complete | 10/2023 | 44.42411 | -75.37919 |
ASA Gouverneur NY Solar I LLC | St Lawrence | 1.5 | (V) Under construction, more than 50 percent complete | 10/2023 | 44.39085 | -75.44324 |
ASA Gouverneur NY Solar II LLC | St Lawrence | 4.0 | (V) Under construction, more than 50 percent complete | 10/2023 | 44.36009 | -75.42747 |
NY Lancaster Shisler Rd Site 2 Solar | St Lawrence | 5.2 | (TS) Construction complete, but not yet in commercial operation | 10/2023 | 44.67888 | -74.96407 |
NY Potsdam 28 Hamilton St. Solar | St Lawrence | 4.4 | (TS) Construction complete, but not yet in commercial operation | 11/2023 | 44.67888 | -74.96407 |
SunEast Fariway Solar Project | St Lawrence | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 44.63516 | -75.44118 |
Chidsey Hill Road Solar | Steuben | 3.0 | (T) Regulatory approvals received. Not under construction | 12/2023 | 42.57306 | -77.16598 |
Clear View Solar | Steuben | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 9/2025 | 42.57062 | -77.46378 |
Mahany | Steuben | 3.0 | (V) Under construction, more than 50 percent complete | 11/2023 | 42.46994 | -77.69541 |
Wheaton-STEU | Steuben | 5.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.55582 | -77.41701 |
Manorville II | Suffolk | 0.6 | (L) Regulatory approvals pending. Not under construction | 10/2024 | 40.83400 | -72.78190 |
Day Hollow Road Solar | Tioga | 5.0 | (T) Regulatory approvals received. Not under construction | 12/2023 | 42.11305 | -76.17806 |
SunEast Valley Solar Project | Tioga | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.08380 | -76.24770 |
Magruder Solar | Ulster | 5.0 | (U) Under construction, less than or equal to 50 percent complete | 10/2023 | 41.60294 | -74.13770 |
West Shore Solar LLC | Ulster | 2.4 | (L) Regulatory approvals pending. Not under construction | 3/2024 | 41.80327 | -73.96494 |
Bald Mountain Solar | Washington | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 6/2025 | 43.13520 | -73.56470 |
FFP – NY Burch | Washington | 2.5 | (V) Under construction, more than 50 percent complete | 11/2023 | 43.32265 | -73.46798 |
SunEast Highview Solar Project | Wyoming | 20.0 | (P) Planned for installation, but regulatory approvals not initiated | 12/2024 | 42.70035 | -77.99672 |
Andy Arthur, 11/8/23 Source: EIA 860 Data (2022) |
Data Source: Energy Information Agency, Preliminary Monthly Electricity Generator Facilities EIA-860M, Released Septmber 2023. Get the data: eia.gov/electricity/data/eia860m
Orth America Land Data Assimilation System Daily Sunlight 1979-2011
The North America Land Data Assimilation System (NLDAS) Daily Sunlight data available on CDC WONDER are county-level daily sunlight (insolation or solar radiation) observations spanning the years 1979-2011. Reported measures are the average daily insolation, reported in kilojoules per square meter (KJ/m2), the number of observations, and the range for the daily insolation values. Data are available by place (combined 48 contiguous states plus the District of Columbia, region, division, state, county), time (year, month, day) and specified daily sunlight value.